Verification Activity
Quality control procedures conducted upon the arrival of goods ensure that components meet the technical requirements of the purchase order. A receiving inspection acts as the first barrier against non conforming material entering the production stream. This process involves verifying quantities, checking for physical damage, confirming the correct part numbers and reviewing the packing list.
Conformance Check
Conformance checks involve a detailed comparison between the physical attributes of the item and the engineering specifications. During a receiving inspection, technicians may perform dimensional measurements or basic electrical tests on a sample from the lot. Discrepancies found at this stage prevent the installation of faulty parts that would be more expensive to replace later.
High risk items require a more rigorous validation approach to protect downstream processes from systemic defects.
Acceptance Criterion
Acceptance criteria for these checks are often defined by an acceptable quality level based on statistical sampling. The depth of the receiving inspection depends on the criticality of the component and the historical performance of the supplier.
Documentation Flow
Documentation flow ensures that the results of the check are recorded and linked to the material batch for future reference. A successful receiving inspection concludes with the formal release of the material into inventory. This record provides the necessary evidence for audits and helps in identifying the source of any issues discovered during final assembly.